Build each cabinet square
Follow the supplied instructions, protect finished faces and check the cabinet before fitting doors or drawers.
INSTALLATION PLANNING GUIDE
A good flat pack kitchen installation is more than assembling boxes. Prepare the room, check the delivered components, establish level reference lines and coordinate cabinet fitting with benchtop, plumbing and electrical work.

BEFORE ASSEMBLY
Read the supplied product instructions and the project documentation before work begins. This guide describes a general planning sequence only; the actual cabinets, wall construction, appliances and site conditions determine the required method.
Confirm demolition and building work are complete enough for an accurate check. Inspect floors and walls, locate studs or suitable fixing points, and compare the finished room with the approved cabinet plan.
Services should be isolated or altered only by the appropriate licensed trades. Do not conceal a discrepancy behind installed cabinets.
Group components by cabinet and compare them with the order before opening everything. Check panels, doors, hardware and visible finishes for transport damage. Keep labels and instructions with their matching cabinet.
ASSEMBLY AND FITTING
Follow the supplied instructions, protect finished faces and check the cabinet before fitting doors or drawers.
Establish reliable level and layout references from the finished floor and room plan.
Start from the plan's controlling corner, tall unit or appliance position rather than the easiest loose cabinet.
Level and align cabinets progressively; do not let a small early error carry through the kitchen.
Clamp and join units using the applicable product instructions while protecting visible surfaces.
Use fixings appropriate to the substrate, cabinet load and applicable instructions or professional advice.
PROJECT SEQUENCE
Position, level, align and secure the main cabinet run.
Confirm fixing points, clearances and alignment before mounting overhead units.
Fit doors, drawers, fillers and visible panels, then adjust gaps and movement.
Coordinate templating, cut-outs, connections and final commissioning with the relevant providers.
DIY OR PROFESSIONAL HELP?
Experienced DIY customers may be comfortable inventorying components, assembling cabinets and carrying out fitting work permitted in their location. The room still needs accurate measurement, appropriate tools and a sound fixing strategy.
Review the measuring guide and current product instructions first.
Electrical, plumbing and gas work must be handled by appropriately licensed people where required. Benchtop fabrication, difficult site conditions, structural questions or uncertainty about secure wall fixing may also justify professional help.
Build the cabinet list in the shop and note requested assembly or installation help when submitting the order.
COMMON QUESTIONS
That depends on your experience, tools, site conditions and the work legally permitted in your location. Follow the supplied cabinet instructions and use appropriately licensed trades for regulated plumbing, electrical or gas work.
Installation sequences vary. Many projects establish the base and tall cabinet run first, but room access, fixing requirements and product instructions can change the sequence. Plan it before assembly.
The correct fixing depends on the wall construction, cabinet, load and fixing points. Follow the product instructions and use appropriate fixings or professional advice; do not assume one generic screw suits every wall.
This depends on the benchtop supplier and material. Site-templated benchtops are commonly confirmed after base cabinets are securely installed, level and in their final positions. Follow the supplier's process.
KEEP PLANNING
READY TO BUILD THE LIST?
Use the guide to organise the room, browse the current cabinet range and submit the selected list for pricing, availability and supply confirmation.